Timeline and events
2003
RailCorp and City of Sydney Council launched a commission into the safety of Goulbourn Street Parking Station, located above the tracks between Central and Town Hall. After deciding the building did not quite meet safety standards, they proceeded to make plans to upgrade the facility.
http://209.85.173.104/search?q=cache:Lp1ib_02GoQJ:www.cityofsydney.nsw.gov.au/
council/documents/meetings/2007/Committee/Finance/200807/070820_FPTC_ITEM04.pdf
+railcorp+goulbourn+street+station&hl=en&ct=clnk&cd=1&gl=au
4th December 2004
Under FOI, SMH obtained details that structures and multi-storey buildings built over railway tracks could be unsafe.
As Sydney grapples with how to accommodate its future population, a report to
RailCorp has warned that building residential apartments over railway lines
is "inherently problematic", could pose safety risks and inhibit growth of
the rail network.
The report, obtained by the Herald under freedom of information legislation, warns that the 40-year-old Hurstville Super Centre, which straddles the tracks, is an example of the problems that could be faced in the future. It says the centre is rundown and does not meet modern safety standards.
"The Hurstville Super Centre does not meet Railcorp standards in a number of respects, including support piers, transfer beams, clearance, centre-line clearance, column and pier stability, structural integrity, vibration and noise isolation and fire life safety," the report, by independent consultant Arnold Dix, says.”
The article, which was only several hundred words in length, only gives specific detail about the Hurstville Super Centre. Other unsafe sites were not listed by RailCorp, as SMH did not have the whole range of documents that they had requested. The reason given, as was outlined later on in the case, was public safety.
http://www.smh.com.au/news/National/Safety-risk-stops-railapartments/2004/12/03/1101923341785.html
25 March, 2006.
SMH launches an investigation into the Goulbourn Street Parking Station. The information they have been able to gain is quite patchy in places, as by this stage they had received limited official
information from RailCorp. Moore quotes a source used by the Telegraph. Very interesting in terms of Freedom Of Information - he speaks in the last couple of paragraphs about the information they HAD obtained from RailCorp - most of the articles they received were blacked-out for the majority of the document. I’ve included the entire article as it’s quite a good read.
(I found the whole article compiled by a blogger named Marvin on the railpage website. http://www.railpage.com.au/f-t11315948.htm. Thanks Marv!)
August 2006Car park danger: if it's been fixed, tell us
By Matthew Moore
FOI Editor
March 25, 2006
FOR nearly three years the city's Goulburn Street car park has resembled a US Government installation at risk of a terrorist attack. Concrete barriers keep vehicles clear of two perimeter walls and wire fencing keeps people away. Scaffolding prevents concrete panels toppling into the streets below, and rows of heavy steel supports prop up the concrete slabs that divide each floor.
Tens of thousands of people a day travel in trains that run under the building, but the Government says it's not in the public interest to let them see the publicly funded reports that say whether the building is at risk of collapse, and what steps have been taken to make it safe.
The Herald applied to RailCorp last year under Freedom of Information laws for documents describing the problem, the recommended solutions and associated correspondence. We sought technical reports on the structural integrity of the car park and the Supa Centre at Hurstville, which sits over the Illawarra railway line, both of which have been identified by RailCorp as being at risk of collapse if a derailed train were to hit supporting piers. After eight months of deliberation, RailCorp has decided to keep secret virtually all reports and correspondence about the car park, which is owned by the City of Sydney. It has done so even though the corporation's freedom of information officer, Nathan Cureton, says "the projects to which the documents relate are essentially complete".
Although RailCorp says it has undertaken "relevant upgrading" of the car park and the Supa Centre, it won't release the documents on the grounds that "to an uninformed person this material does not indicate that the work has been carried out …" RailCorp has used a barrage of arguments to hide the facts. It relies heavily on one which says it could suffer financially if the public read the expert material. "Given that the rail network is a business catering for millions of customers, its success is contingent on those customers having confidence in it and using it … A lack of consumer confidence in, for example, the safety of the rail system will result in less customers and, as a result, a major loss of revenue to this agency." Mr Cureton says passengers deserting RailCorp would trigger a wider problem for NSW. "… as customers seek alternative means of transport the state will be substantially adversely affected as well", he wrote in a 10-page letter. Experience makes these claims seem dubious.
In mid-2003 The Daily Telegraph published several stories quoting an expert report which said the columns supporting the Goulburn Street car park had only 10 to 20 per cent of the strength needed to stop the building collapsing in a train derailment. No boycott of the rail system followed. At the same time, the then head of State Rail and the current head of RailCorp, Vince Graham, included the Goulburn Street car park in a list of six sites he identified as being at high risk of collapse in the event of train derailments. Other sites on the list included the Hurstville Supa Centre, a car park at Marrickville, a shopping centre at North Sydney and structures at Bankstown and Central stations.
Increased threat of a terrorist attack was another reason RailCorp cited to withhold all parts of a risk management study, a crash-barrier assessment of the car park. Because such documents include plans and loading capacities, RailCorp claims their release could "undermine the structural integrity" of the building, even though sensitive details could easily be withheld. The only documents released were 30 pages of minutes of meetings, but every page was blanked out completely or left with a few meaningless words.
It took RailCorp 140 hours to gather the reports and decide to exempt virtually everything. It estimated the cost of doing this at $4200 but, because it was months late replying to the request, it cut the cost of providing no information to $360.
The Herald is appealing.
RailCorp and City of Sydney Council make plans on the upgrade of Goulbourn Street Parking Station. In August 2007, City of Sydney Council released a financial report, outlining:
A report on the condition of the parking station was presented to Council in August 2006 setting out essential maintenance works in progress and providing a range of options for the future of the Parking Station.
As a consequence, a study of future use options for the Parking Station was undertaken. The study concluded that major redevelopment of the property for other use(s) was not viable in the short to medium term and that, as a necessary and interim measure, the building should be upgraded in line with the technical reports prepared by consultants.
The purposes of the approach now proposed are:
(a) to improve the visual amenity of the Parking Station;
(b) ensure continuity of revenue; and
(c) maintain safe operation.
A recent meeting with the Chief Executive Officer of RailCorp confirmed, in principle, agreement with that approach.
http://www.cityofsydney.nsw.gov.au/council/documents/meetings/2007/Committee/Finance/200807/070820_FPTC_ITEM04.pdf
21st March 2007
AM
SMH, after finally recieving documents from RailCorp (after a two year battle), releases details that the organisation has covered up five possible areas of danger to the public. SMH obtained information about unsafe structures built above tracks at five sites along the cityrail network. These include the Hurstville Super Centre (above Hurstville Station), Goulbourn Street Parking Station (in between Central and Town Hall stations), the Cahill Expressway (above Circular Quay), a rail structure built above Central Station, and North Sydney station.
The article states that a derailment at Hurstville Station, located underneath the Super Centre, would result in a disaster similar to that of the Granville train accident in 1977, where the deaths of 83 people could be linked to a faulty structure above the railine.
Michael Moore again stresses the battle the paper had with RailCorp, saying that "piecing together the risks involved and what has been done to these structures is difficult because RailCorp heavily censored the documents provided under the FoI request."
http://www.smh.com.au/news/national/coverup-rail-crash-risks-compared-to-granville/2007/03/20/1174153066795.html
PM
Railcorp releases a statement of defence on their website, and Chief Executive Officer, Vince Graham fronts the press. They state reasons for public safety for not releasing the report earlier.
Mr Graham said that RailCorp had provided most of the documents that related to the structures, to the applicant… In the interests of protecting the security of the structures, some of the details in these documents were not released. Following a review which was requested by the NSW Ombudsman, RailCorp maintained its position that releasing these documents would compromise the security of the structures. This decision was based on the fact that the remaining documents contained detailed information about the structures that if made public would pose a security risk. RailCorp stands by its decision not to release information that amounts to a ‘how to’ manual for individuals wanting to destroy a structure in a high density areas and pose serious danger to passengers and staff.
http://www.cityrail.info/news/070321-structures.jsp
Present
Since the information has been released, RailCorp has kept a track on their website of the upgrades they’ve undertaken, and no doubt Moore had as well. The Goulbourn Street Parking Station still looks a little uncertain.

I'm planning on going to a few of the sites to see whether there has been any obvious developments. I think it is a fair call to say that, as a result of the pressure that SMH put on RailCorp, these places will be a lot safer. Hopefully this will also lead RailCorp to be a little more transparent in the future.